BSI - BS EN IEC 62271-202
High-voltage switchgear and controlgear Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV
inactive
| Organization: | BSI |
| Publication Date: | 30 September 2022 |
| Status: | inactive |
| Page Count: | 126 |
| ICS Code (High voltage switchgear and controlgear): | 29.130.10 |
Document History
September 30, 2022
High-voltage switchgear and controlgear Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV
A description is not available for this item.
BS EN IEC 62271-202
September 30, 2022
High-voltage switchgear and controlgear Part 202: AC prefabricated substations for rated voltages above 1 kV and up to and including 52 kV
A description is not available for this item.
June 30, 2014
High-voltage switchgear and controlgear Part 202: High voltage/low-voltage prefabricated substation
A description is not available for this item.
June 30, 2014
High-voltage switchgear and controlgear - Part 202: High voltage/low voltage prefabricated substation
A description is not available for this item.
June 30, 2014
High-voltage switchgear and controlgear Part 202: High voltage/low-voltage prefabricated substation
A description is not available for this item.
March 30, 2007
High-voltage switchgear and controlgear - Part 202: High voltage/low voltage prefabricated substation
A description is not available for this item.