UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ISO - 24675-1

Railway Applications — Running time calculation for timetabling — Part 1: Requirements

active, Most Current
Organization: ISO
Publication Date: 1 October 2022
Status: active
Page Count: 28
ICS Code (Transport by rail): 03.220.30
ICS Code (Railway engineering in general): 45.020
scope:

In order to create punctual timetables, it is necessary to accurately calculate and plan out many values, such as running time between stations, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and capacity of the line/infrastructure.

Among these values, shortest running time between stations must be calculated first, as this is the basis of timetabling.

This document describes parameters as the requirements for shortest running time calculation that enable railway infrastructure managers, railway operators and related organizations to calculate accurate running time at the stage of setting up a feasible and punctual daily and annual timetable.

In addition, this document shows the appropriateness of calculation by verifying the response observed on the calculated shortest running time when the parameter values are changed.

This document excludes running time calculation used for purposes other than timetabling.

Document History

24675-1
October 1, 2022
Railway Applications — Running time calculation for timetabling — Part 1: Requirements
In order to create punctual timetables, it is necessary to accurately calculate and plan out many values, such as running time between stations, headway between trains, train scheduling, rolling...

References

Advertisement