AENOR - UNE-EN 12952-5
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
active, Most Current
| Organization: | AENOR |
| Publication Date: | 2 November 2022 |
| Status: | active |
| Page Count: | 99 |
| ICS Code (Boilers and heat exchangers): | 27.060.30 |
| ICS Code (Gas and steam turbines. Steam engines): | 27.040 |
Document History
UNE-EN 12952-5
November 2, 2022
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
A description is not available for this item.
March 7, 2012
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
A description is not available for this item.
March 14, 2003
Water tube boilers and auxiliary installations. Part 5: Workmanship and construction of pressure parts of the boiler.
A description is not available for this item.