UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

CEN - EN 12952-9

Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler

active, Most Current
Organization: CEN
Publication Date: 1 October 2022
Status: active
Page Count: 34
ICS Code (Gas and steam turbines. Steam engines): 27.040
scope:

Firing systems

This document applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel storage system and ends at the ash extraction plant. For multifuel firing systems using separate or combined burners, these requirements apply to the pulverized fuel firing part involved. For other fuels or firing systems used in combination, other requirements apply, e.g. EN 12952-8:2022.

Fuels

These requirements cover the use of pulverized fuels (e.g. coke, anthracite, bituminous coal or hard coal, lignite or brown coal, petrol coke, oil shale and pulverized bio mass) ranging from low to high volatile matter content.

Operation

Requirements for operational equipment apply for steam boilers and hot water generators with permanent supervision by properly trained persons.

As firing systems using pulverized fuel can be designed either as direct-firing or as indirect-firing systems, operational requirements have to be differentiated. Annex A summarizes the operational requirements for firing systems including the pulverizing system.

Document History

EN 12952-9
October 1, 2022
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
Firing systems This document applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized...
December 1, 2002
Water-tube boilers and auxiliary installations Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
A description is not available for this item.

References

Advertisement