UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR RT/E/P/27167

Procedure for Inspection of Bonds attached to Scaffolding on AC Electrified Lines (aka NR/SP/ELP/27167)

inactive
Buy Now
Organization: NR
Publication Date: 1 December 2004
Status: inactive
Page Count: 19
scope:

Introduction

In certain circumstances it is necessary to undertake the bonding of temporary scaffolding in use in connection with the repair, erection or maintenance of structures over or in close proximity to A.C. electrified lines. Code of Practice ECP101 : 1985, "Earthing and Bonding for 50hz. Single Phase A.C. Electrification" and "Working Instructions for A.C. Electrified Lines" (BR 29987), give details of when such bonding is required.

Document History

NR RT/E/P/27167
December 1, 2004
Procedure for Inspection of Bonds attached to Scaffolding on AC Electrified Lines (aka NR/SP/ELP/27167)
Introduction In certain circumstances it is necessary to undertake the bonding of temporary scaffolding in use in connection with the repair, erection or maintenance of structures over or in close...

References

Advertisement