UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

WEF - P220008

Basic Laboratory Procedures for the Operator–Analyst

active, Most Current
Organization: WEF
Publication Date: 4 October 2022
Status: active
Page Count: 425
scope:

This Manual of Practice presents current design considerations for wastewater and stormwater pumping stations. It covers station capacity requirements and configuration, the selection, and design of pumping equipment, piping system layout and hydraulic considerations, electrical and instrumentation systems design, and other station appurtenances.

Intended for design professionals, it addresses the design of stations of all sizes and highlights the differences between wastewater and stormwater stations.

Document History

P220008
October 4, 2022
Basic Laboratory Procedures for the Operator–Analyst
This Manual of Practice presents current design considerations for wastewater and stormwater pumping stations. It covers station capacity requirements and configuration, the selection, and design of...
February 1, 2012
Basic Laboratory Procedures for the Operator-Analyst
The essential laboratory resource for the operator-analyst.
Advertisement