NR - RT/E/P/27169 ISSUE 1

Isolation of Switching Stations at Electrical Control Room Boundaries to Comply with Issue of Permits to Work & Sanctions for Test (aka NR/SP/ELP/27169)

inactive
Organization: NR
Publication Date: 4 December 2004
Status: inactive
Page Count: 18
scope:

Introduction

At those Switching Stations where the High Voltage equipment is part/dual controlled from two different Electrical Control Rooms the following arrangements will apply for isolation of the high voltage equipment and issue of Permit to Work (BR 12012/1) or Sanction for Test (BR 12012/2).

Document History

April 1, 2006
Isolation of Switching Stations at Electrical Control Room Boundaries to Comply with Issue of Permits-to-Work & Sanctions-for-Test Certificates
Introduction At switching stations where the high voltage equipment is part or dual controlled from two different Electrical Control Rooms (ECR) the following arrangements will apply for isolation...
RT/E/P/27169 ISSUE 1
December 4, 2004
Isolation of Switching Stations at Electrical Control Room Boundaries to Comply with Issue of Permits to Work & Sanctions for Test (aka NR/SP/ELP/27169)
Introduction At those Switching Stations where the High Voltage equipment is part/dual controlled from two different Electrical Control Rooms the following arrangements will apply for isolation of...