NR/L3/MTC/TK0174 ISSUE 1
Management of Cold Weather Precautions (Track)
| Organization: | NR |
| Publication Date: | 1 October 2007 |
| Status: | inactive |
| Page Count: | 12 |
scope:
This procedure is applicable to all Network Rail staff, and all contractors employed by Network Rail who are responsible for inspection and maintenance of track.
This procedure applies to the management of weather precautions relating to track within the maintenance organisation.
This procedure details the posts responsible within the maintenance organisation for ensuring that actions are taken where non-compliances are identified.
It does not include other functions within maintenance or the management of structures.
Purpose
This Standard Maintenance Procedure details the roles and responsibilities within the Maintenance organisation in the management of weather precautions relating to cold weather situations.
The procedure reflects the requirements of:
NR/SP/TRK/001 Inspection and maintenance of permanent way
NR/SP/TRK/0011 Continuous Welded Rail (CWR) Track
NR/SP/TRK/102 Track Construction Standard
NR/WI/TRK/001 Track Inspection Handbook
NR/PRC/MTC/TK0077 Management of rail stress and critical rail temperatures
Document History