UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

AENOR - UNE 60405-2/1M

Transition mechanical connections PE - metals, for mains, connections and receiving installations with a service pressure up to 10 bar. Part 2 : Fixed mechanical connections.

inactive
Organization: AENOR
Publication Date: 6 February 2004
Status: inactive
Page Count: 8
ICS Code (Gas supply systems): 91.140.40

Document History

September 21, 2011
Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2 : Fixed mechanical connections.
A description is not available for this item.
March 4, 2009
Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2: Fixed mechanical connections.
A description is not available for this item.
January 16, 2008
Gaseous fuels. Transition mechanical connections PE-metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2: Fixed mechanical connections.
A description is not available for this item.
UNE 60405-2/1M
February 6, 2004
Transition mechanical connections PE - metals, for mains, connections and receiving installations with a service pressure up to 10 bar. Part 2 : Fixed mechanical connections.
A description is not available for this item.
January 31, 2003
Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2 : Fixed mechanical connections.
A description is not available for this item.
Advertisement