NR/L2/MTC/CP008/04 ISSUE 1

COVID-19 Works Contingency Plan: Returning to a Full Operational Service

active, Most Current
Organization: NR
Publication Date: 30 November 2020
Status: active
Page Count: 12
scope:

The module covers:

a) Track, S&C and Off Track;

b) Traction Power/Power Distribution;

c) Telecoms;

d) Signalling;

e) Geotechnics, Structures, Tunnels and Buildings;

f) Plant;

g) Traction and Rolling Stock; and

h) Level Crossings.

Purpose 

This module provides guidance on the steps required to move between route Category Levels and reintroduce a full operational service to lines following a period of reduced maintenance, service reduction and/or de-energisation.

Document History

NR/L2/MTC/CP008/04 ISSUE 1
November 30, 2020
COVID-19 Works Contingency Plan: Returning to a Full Operational Service
The module covers: a) Track, S&C and Off Track; b) Traction Power/Power Distribution; c) Telecoms; d) Signalling; e) Geotechnics, Structures, Tunnels and Buildings; f) Plant; g) Traction and...