UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ATIS 0300018

Next Generation Interconnection Interoperability (NGIIF) Reference Document: Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment G Link Diversity Validation Guidelines

active, Most Current
Buy Now
Organization: ATIS
Publication Date: 1 December 2011
Status: active
Page Count: 11
scope:

Purpose of Document

The purpose of this document is to provide guidance for the validation of diversity to providers of signaling system 7 links to ensure the integrity of the signaling system 7 network.

CAUTION:

Physical Validation should be considered as being able to cause link failures. Existing NIIF Maintenance procedures (SS7 III) should be followed. When and if a company intends to perform physical validation of diversification by intrusive methods, the interconnected companies shall agree on the methodology, date, and time for the intrusive validation.

This document does not replace or supersede any existing contracts, tariffs or any other legally binding document.

Document History

ATIS 0300018
December 1, 2011
Next Generation Interconnection Interoperability (NGIIF) Reference Document: Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment G Link Diversity Validation Guidelines
Purpose of Document The purpose of this document is to provide guidance for the validation of diversity to providers of signaling system 7 links to ensure the integrity of the signaling system 7...
April 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment G Link Diversity Validation Guidelines
Purpose of Document The purpose of this document is to provide guidance for the validation of diversity to providers of signaling system 7 links to ensure the integrity of the signaling system 7...
February 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment G Link Diversity Validation Guidelines
Purpose of Document The purpose of this document is to provide guidance for the validation of diversity to providers of signaling system 7 links to ensure the integrity of the signaling system 7...
January 1, 2008
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment G Link Diversity Validation Guidelines
Purpose of Document The purpose of this document is to provide guidance for the validation of diversity to providers of signaling system 7 links to ensure the integrity of the signaling system 7...

References

Advertisement