NR/L3/ELP/SAI25/11 ISSUE 1
Working On or About Overhead Line Equipment (SAI): Working On Overhead Line Equipment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
| Organization: | NR |
| Publication Date: | 3 June 2023 |
| Status: | active |
| Page Count: | 15 |
scope:
This module states the requirements to be met when working on Overhead Line Equipment.
It is applicable to Network Rail personnel and to Network Rail's contractors.
To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.
This Standard also includes:
• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).
• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).
• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area - Module Z).
Purpose
This module provides a consistent approach to working on Overhead Line Equipment.
NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16).