ARMY - MIL-PRF-32389 (1)
LOAD BANK, ELECTRICAL
| Organization: | ARMY |
| Publication Date: | 16 May 2023 |
| Status: | active |
| Page Count: | 14 |
scope:
Scope.
This document specifies the requirements for the design modification, fabrication, integration, test, and verification of a Load Bank, Electrical, hereinafter referred to as Load Bank. The Load Bank is intended to replace the TS-4216/G Load Bank (6625-01-220-2619), which is defined by military specification MIL-L-52366.
intended Use:
Equipment covered by this specification is intended for use in testing single-phase and 3-phase generators under full load.
Document History