DI-EMCS-81855A
HIGH-ALTITUDE EMP (HEMP) HARDNESS MAINTENANCE AND HARDNESS SURVEILLANCE (HM/HS) PLAN
| Publication Date: | 20 March 2023 |
| Status: | active |
| Page Count: | 4 |
scope:
A general description of the overall HM/HS requirements matrix that is used to maintain and demonstrate the HPS' sustained lifecycle compliance with MIL-STD-3023A's performance requirements. This description will include the relative roles of routine maintenance procedures (i.e., HM), and of analyses, tests and inspections (i.e., HS).
A logistics support analysis shall be described to define the HM/HS requirements, supply support requirements, training requirements, and technical data requirements, and identify all HCIs and HCAs. A means for maintaining configuration management as the HPS, including associated MCS special protective measures, is modified will also be described.
Document History