UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DSF/PREN IEC 62382

Control systems in the process industry – Electrical and instrumentation loop check

pending, Most Current
Organization: DS
Status: pending
Page Count: 27
ICS Code (Industrial process measurement and control): 25.040.40
scope:

1.1 General applicability This international standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the beginning of cold commissioning. This document is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I (Electrical & Instrument) installations in existing plants (including PLC, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). Loop checks can be performed throughout the lifecycle of the plant. This document is also applicable when loop checks are performed after commissioning. The document describes what is to be tested but not how it is to be tested due to the wide range of technologies and equipment available. The intent of this document is to provide a means for all parties, including the owner, the installer and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities described in this document can be taken as a guideline and adapted to the specific requirements of the process/plant/equipment. 1.2 Exclusions 1.2.1 Prior and post activities Engineering and manufacturing activities prior to or after the loop checks, such as FAT, SAT, SIT and commissioning, are not covered by this document. 1.2.2 Regulated industries For applications in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations apply in accordance with existing standards. 1.2.3 Safety instrumented systems IEC 61511 provides requirements for checks and validation of Safety Instrumented Systems. 1.2.4 Manufacturing execution systems Testing and verification of Manufacturing Execution Systems (MES) is not covered by this document. 1.2.5 Advanced process control Testing and verification of Advanced Process Control (APC) is not covered by this document. 1.2.6 Security for industrial automation and control systems IEC 62443 provides requirements for network and system security

Document History

DSF/PREN IEC 62382
Control systems in the process industry – Electrical and instrumentation loop check
1.1 General applicability This international standard defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including...
Advertisement