UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

CSA/AM - CSA/ANSI HGV 4.5:23

Priority and sequencing equipment for hydrogen fuelling stations

active, Most Current
Organization: CSA/AM
Publication Date: 1 January 2023
Status: active
Page Count: 34
ICS Code (Petroleum products and natural gas handling equipment): 75.200
scope:

Inclusions

This Standard applies to priority and sequencing equipment used in compressed gaseous hydrogen fuelling stations and specifies general, materials, construction, and assembly requirements.

Exclusions

This Standard does not apply to equipment already covered by CSA/ANSI HGV 4.9.

Terminology

In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the Standard.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Units of measure

The values given in SI units are the units of record for the purposes of this Standard. The values given in parentheses are for information and comparison only.

Document History

CSA/ANSI HGV 4.5:23
January 1, 2023
Priority and sequencing equipment for hydrogen fuelling stations
Inclusions This Standard applies to priority and sequencing equipment used in compressed gaseous hydrogen fuelling stations and specifies general, materials, construction, and assembly requirements....
January 1, 2013
Standard for Priority and sequencing equipment for hydrogen vehicle fueling
These requirements apply to priority and sequencing equipment (see Part IV - Definitions) which is part of a hydrogen gas vehicle fueling system, hereinafter referred to as equipment. Priority and...

References

Advertisement