BSI - BS EN 13232-4
Railway applications - Track - Switches and crossings for Vignole rails Part 4: Actuation, locking and detection
active, Most Current
| Organization: | BSI |
| Publication Date: | 31 October 2023 |
| Status: | active |
| Page Count: | 30 |
| ICS Code (Construction of railways): | 93.100 |
Document History
BS EN 13232-4
October 31, 2023
Railway applications - Track - Switches and crossings for Vignole rails Part 4: Actuation, locking and detection
A description is not available for this item.
October 31, 2005
Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
A description is not available for this item.
October 31, 2005
Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
A description is not available for this item.