UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN 13232-9

Railway applications - Track - Switches and crossings for Vignole rails - Part 9: Layouts

active, Most Current
Organization: NEN
Publication Date: 1 October 2023
Status: active
Page Count: 18
ICS Code (Construction of railways): 93.100
scope:

This document:

- defines the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled whether in the fabrication plant, or trackside in the case of layouts that are delivered as components, part assembled or in "kit" form;

- determines the extent of supply;

- defines the minimum requirements for traceability.

This document applies only to layouts that are assembled in the manufacturing plant or that are assembled for the first time at trackside.

Other aspects such as installation and maintenance also influence performance; these are not considered as part of this document.

Document History

NEN-EN 13232-9
October 1, 2023
Railway applications - Track - Switches and crossings for Vignole rails - Part 9: Layouts
This document: — defines the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled whether in the fabrication plant, or trackside in the case of layouts that are...
February 1, 2020
Railway applications - Track - Switches and crossings for Vignole rails - Part 9: Layouts
This document is to: — define the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled whether in the fabrication plant, or trackside in the case of layouts that...
June 1, 2014
Railway applications - Track - Switches and crossings for Vignole rails - Part 9: Layouts
This part of this EN is to: - define the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts...
October 1, 2011
Railway applications - Track - Switches and crossings - Part 9: Layouts
The scope of this part is: - to describe the design process of switches and crossings, and the use of the other parts of this standard; - to define the main criteria to be taken into account during...
May 1, 2011
Railway applications - Track - Switches and crossings - Part 9: Layouts
A description is not available for this item.
June 1, 2006
Railway applications - Track - Switches and crossings - Part 9: Layouts
The scope of this part is: to describe the design process of switches and crossings, and the use of the other parts of this standard; to define the main criteria to be taken into account during the...
July 1, 2003
Railway applications - Track - Switches and crossings - Part 9: Layouts
The scope of this part is: to describe the design process of switches and crossings, and the use of the other parts of this standard; to define the main criteria to be taken into account during the...

References

Advertisement