API - RP 92M ERTA 2
Managed Pressure Drilling Operations with Surface Back-pressure
active
| Organization: | API |
| Publication Date: | 1 November 2023 |
| Status: | active |
| Page Count: | 1 |
Document History
RP 92M ERTA 2
November 1, 2023
Managed Pressure Drilling Operations with Surface Back-pressure
A description is not available for this item.
September 1, 2017
Managed Pressure Drilling Operations with Surface Back-pressure
This document provides information for planning, installation, testing and operation of wells drilled with surface back-pressure managed pressure drilling (MPD). This document applies only to...
September 1, 2017
Managed Pressure Drilling Operations with Surface Back-pressure
This document provides information for planning, installation, testing and operation of wells drilled with surface backpressure managed pressure drilling (MPD).
This document applies only to...
September 1, 2017
Managed Pressure Drilling Operations with Surface Back-pressure
This document provides information for planning, installation, testing and operation of wells drilled with surface backpressure managed pressure drilling (MPD). This document applies only to drilling...
September 1, 2017
Managed Pressure Drilling Operations with Surface Back-pressure
This document provides information for planning, installation, testing and operation of wells drilled with surface back-pressure managed pressure drilling (MPD). This document applies only to...