scope:
This document applies to maintenance tasks performed by Network Rail or its contractors undertaken on fixed plant in order to comply with the maintenance specification NR/L2/ELP/27238.
Specific work instructions have been developed for :-
Points Heating - Electric
Maintenance of Signalling Principal Supply Point Switchgear and Control gear
Diesel Generators for Signalling Supplies
Uninterruptible Power Supplies (UPS) >10 kVA
Functional Supply Points (FSPs)
SIGNET Automatic Recloser
"Non-Traction" High Voltage Apparatus and Sub Stations/Compounds
External Fixed Lighting Installations
Internal Fixed Lighting Installations
Unmanned Lineside Building Services
Pumping Systems
Electrical Installations
Shore Supplies
Periodic Electrical Inspections
Moving Bridges ( 5 Off )
Purpose: This specification details the particular actions to be undertaken during maintenance activities performed on Network Rail's fixed plant equipment