UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR RT/E/WI/27055

Instruction for Routine Testing & Maintenance of Transformer & Switchgear Oil

inactive
Buy Now
Organization: NR
Publication Date: 4 December 2004
Status: inactive
Page Count: 29
scope:

This Instruction applies to uninhibited insulating oils in transformers, switchgear and similar apparatus where sampling is practicable.

Low oil volume equipment which does not contain a reserve of oil for testing purposes, or equipment which is not designed for the process of routine oil sampling are excluded from this instruction.

Purpose

This Instruction details the periodicity and the necessary testing required to ensure that insulating oil conforms to the British Standard BS 5730:1979, to determine the suitability of the oil for further service and for the detection defects within apparatus not obvious to other forms of inspection.

Document History

NR RT/E/WI/27055
December 4, 2004
Instruction for Routine Testing & Maintenance of Transformer & Switchgear Oil
This Instruction applies to uninhibited insulating oils in transformers, switchgear and similar apparatus where sampling is practicable. Low oil volume equipment which does not contain a reserve of...
Advertisement