UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1

HPSS Installation Manual: HPSS for Plain Lead Switches (UIC54 & RT60)

inactive
Organization: NR
Publication Date: 15 June 2009
Status: inactive
Page Count: 91
scope:

Scope of Document

This document describes how to install the current build standards of UIC54 and RT60 HPSS systems, for all approved switch sizes. There are a number of steps that are common to all switch types and sizes; however where there are specific variations relating to a particular switch type / size these are highlighted within the procedures.

Maintenance of the HPSS shall be carried out in accordance Network Rail procedures, and the appropriate SMS documentation.

Purpose

The purpose of this document is to provide comprehensive procedures, including 'best practice', for the installation and setting-up of the IAD Rail Systems' High Performance Switch System (HPSS). This comprises both the High Performance Switch Actuator (also known as the HPSA) and the PowerLink Backdrive.

Document History

HPSS Comprising High Performance Switch Actuator and Powerlink Backdrive
Scope of Document This document describes how to install the current build standards of UIC54 and RT60 HPSS systems, for all approved switch sizes. There are a number of steps that are common to all...
NR/L2/SIG/11400/ER/R/1/0224 ISSUE 1
June 15, 2009
HPSS Installation Manual: HPSS for Plain Lead Switches (UIC54 & RT60)
Scope of Document This document describes how to install the current build standards of UIC54 and RT60 HPSS systems, for all approved switch sizes. There are a number of steps that are common to all...

References

Advertisement