UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/TRK/0030 ISSUE 1

Reinstatement of Absolute Track Geometry (WCML Routes)

inactive
Organization: NR
Publication Date: 1 June 2008
Status: inactive
Page Count: 33
scope:

The Procedure is not applicable to WCRM Projects that continue to work to their own project specific procedures.

ATG is not continuous in these sections.

When project work is planned within any of the route sections listed, the Designated Project Engineer, or nominated Project Engineer (Track) will consult the consult the Senior Design Engineer (A.T.G) in the I & I Track programme to confirm that A.T.G is installed for the specific location of their work. The absolute limits are defined in the A.T.G Database.

If ATG does not exist, then a conventional design for the site shall be developed, by the party that requires an alignment design, through their nominated designer

PURPOSE

The track on Enhanced Permissible Speed sections of the West Coast Main Line fast lines is installed to an 'Absolute Track Geometry' (ATG).

This is a defined alignment design that must be reinstated when the track is disturbed by track maintenance, track renewal or other work. The Safety Case for Enhanced Permissible Speed demands this.

This procedure defines:

  • How infrastructure Investment projects will manage changes to the A.T.G Design.
  • How infrastructure investment teams will design track alignments adjacent to A.T.G. alignments
  • How Infrastructure Investment project teams will manage the reinstatement of the A.T.G Track alignment for plain line and S&C.
  • How the Infrastructure Investment project teams and their contractors will install A.T.G. alignments.

The procedure is not applicable on the WCRM Projects that are governed by their own procedures.

Document History

June 3, 2017
Reinstatement of Absolute Track Geometry (ATG) West Coast Main Line (WCML) Routes
This Network Rail standard specifies the requirements for the reinstatement of ATG track with line speeds up to 125 mph where class 221 and 390 tilting vehicles operate. This includes: a. the...
NR/L3/TRK/0030 ISSUE 1
June 1, 2008
Reinstatement of Absolute Track Geometry (WCML Routes)
The Procedure is not applicable to WCRM Projects that continue to work to their own project specific procedures. ATG is not continuous in these sections. When project work is planned within any of...

References

Advertisement