NR - RT/E/WI/27127 ISSUE 1

BR/Euro Tunnel Electrical Interface at Folkestone Operating & Maintenance Procedures

inactive
Organization: NR
Publication Date: 4 December 2004
Status: inactive
Page Count: 23
scope:

Introduction

The attached document sets out the electrical operating and maintenance procedures for work on the overhead catenary system (OCS), permanent way (Track) and distribution equipment, at the interface between British Rail (BR) and Euro Tunnel (ET) at Folkestone.

This represents the safety procedures agreed by British Rail (BR) and Euro Tunnel (ET) when working within the interface zone. Although this instruction is in draft form, the information contained within shall be used as the basis for present Operations pending its final ratification.

The second draft includes reference to forms BR/ET and ET/BR which have been introduced to replace form 'N' at the Folkestone interface.

Document History

December 1, 2005
Work Instruction for Network Rail/Euro Tunnel Electrical Interface at Folkestone Operating and Maintenance Procedures (aka NR/WI/ELP/27137)
This instruction sets out the electrical operating and maintenance procedures for work on the overhead catenary system, permanent way and distribution equipment at the interface between Network Rail...
RT/E/WI/27127 ISSUE 1
December 4, 2004
BR/Euro Tunnel Electrical Interface at Folkestone Operating & Maintenance Procedures
Introduction The attached document sets out the electrical operating and maintenance procedures for work on the overhead catenary system (OCS), permanent way (Track) and distribution equipment, at...