NR/PRC/MTC/SG0065 ISSUE 1
Management of Disconnections that Affect Signalling Equipment
| Organization: | NR |
| Publication Date: | 1 June 2007 |
| Status: | inactive |
| Page Count: | 13 |
scope:
This procedure covers disconnections to signalling equipment carried out by Network Rail maintenance; it does not cover disconnections associated with new works or major renewals.
This procedure does not cover personal safety requirements.
All maintenance signalling disconnections are covered except for axle counters systems (covered in NR/PRC/MTC/SG0155)
Individual role/position responsibilities for this procedure are detailed in the RACI (section 5).
Purpose
This procedure details the roles and responsibilities for the disconnection of signalling equipment for preventative or corrective maintenance, minor renewals, or safety that will or may affect the normal running of trains.
Document History