UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/PRC/MTC/TK0075 ISSUE 1

Management of Visual Inspection (aka NR/L3/MTC/TK0075)

inactive
Organization: NR
Publication Date: 1 February 2006
Status: inactive
Page Count: 17
scope:

The Procedure:

• Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to:

• Basic visual track inspection

• Supervisor visual track inspection (including cab riding and renewal proposal identification)

• Track Maintenance Engineer visual track inspection (including cab riding and renewal proposal identification)

• Buffer stops

• Tunnel inspection

• Longitudinal timbers

• Switches secured out of use

• Handpoints

• Inspection and repair procedures to reduce the risk of derailment at switches in accordance with NR/SP/TRK/053

• Track drainage

• Fencing

• AMS/MHT switches

• DOES NOT apply to ultrasonic inspection covered by Management of manual ultrasonic rail testing NR/PRC/MTC/TK0084

• DOES NOT apply to inspection of welds covered by Management of rail welding NR/PRC/MTC/TK0081

Purpose

This Procedure defines the standard process, roles and responsibilities for visual inspection on the network in accordance with Inspection and Maintenance of Permanent Way NR/SP/TRK/001 and Track Inspection Handbook NR/WI/TRK/001.

Document History

August 26, 2008
Management of Permanent Way Inspections (aka NR/L3/MTC/TK0075)
The Procedure: • Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to the following regular inspections as defined...
October 1, 2006
Management of Permanent Way Inspections (aka NR/L3/MTC/TK0075)
The Procedure: • Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to the following regular inspections as defined...
NR/PRC/MTC/TK0075 ISSUE 1
February 1, 2006
Management of Visual Inspection (aka NR/L3/MTC/TK0075)
The Procedure: • Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to: • Basic visual track inspection •...

References

Advertisement