NR/PRC/MTC/TK0075 ISSUE 1
Management of Visual Inspection (aka NR/L3/MTC/TK0075)
| Organization: | NR |
| Publication Date: | 1 February 2006 |
| Status: | inactive |
| Page Count: | 17 |
scope:
The Procedure:
• Applies to all forms of visual inspection, by maintenance teams at Area and Delivery Unit levels. These include but are not limited to:
• Basic visual track inspection
• Supervisor visual track inspection (including cab riding and renewal proposal identification)
• Track Maintenance Engineer visual track inspection (including cab riding and renewal proposal identification)
• Buffer stops
• Tunnel inspection
• Longitudinal timbers
• Switches secured out of use
• Handpoints
• Inspection and repair procedures to reduce the risk of derailment at switches in accordance with NR/SP/TRK/053
• Track drainage
• Fencing
• AMS/MHT switches
• DOES NOT apply to ultrasonic inspection covered by Management of manual ultrasonic rail testing NR/PRC/MTC/TK0084
• DOES NOT apply to inspection of welds covered by Management of rail welding NR/PRC/MTC/TK0081
Purpose
This Procedure defines the standard process, roles and responsibilities for visual inspection on the network in accordance with Inspection and Maintenance of Permanent Way NR/SP/TRK/001 and Track Inspection Handbook NR/WI/TRK/001.
Document History