UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/PS/ELP/27182

Insulating Shroud for Foot of Conductor Rail (aka NR/SP/ELP/27182)

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 April 2006
Status: active
Page Count: 13
scope:

This product specification covers the design, manufacture and testing of a conductor rail shroud for use in conjunction with Network Rail standard conductor rail systems other than the DC Electrified lines in the Liverpool area. Although made from an insulating material, the shroud is to act as a reminder to staff that the conductor rail is adjacent to the track circuit rail and they must not apply a short circuiting device. The shroud is not a primary insulator.

Document History

NR/PS/ELP/27182
April 1, 2006
Insulating Shroud for Foot of Conductor Rail (aka NR/SP/ELP/27182)
This product specification covers the design, manufacture and testing of a conductor rail shroud for use in conjunction with Network Rail standard conductor rail systems other than the DC Electrified...
December 4, 2004
Insulating Shroud for Foot of Conductor Rail (aka NR/SP/ELP/27182)
This specification covers the design, manufacture and testing of a conductor rail shroud for use in conjunction with BR standard conductor rail systems other than the Mersey Rail DC Electrified line...

References

Advertisement