This document references:
NR/L3/TRK/002/A08 - Flood Warning Inspection
Published by NR
on
August 1, 2007
Includes: Inspection of track after flooding Excludes: Examination of any supporting structures or earthworks to determine damage due to scour or water logging
This document references:
NR/SP/CTM/011 - Competence & Training in Track Engineering
Published by NR
on
December 1, 2006
This specification applies to all employers and people who undertake track engineering work on Network Rail controlled infrastructure. Purpose This specification sets out the minimum requirements for...
This document references:
NR/L3/TRK/002/A08 - Flood Warning Inspection
Published by NR
on
August 1, 2007
Includes: Inspection of track after flooding Excludes: Examination of any supporting structures or earthworks to determine damage due to scour or water logging
This document references:
NR/L3/TRK/1013 - Maintenance of Track Assets
Published by NR
on
August 26, 2008
This process covers the maintenance of Network Rail track and lineside assets. It does not cover the inspection. This process applies to you if. • You manage or supervise maintenance teams or...
This document references:
NR/L2/TRK/001 - Inspection and Maintenance of Permanent Way
Published by NR
on
June 5, 2021
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings: a) plain line track; b) switches and crossings (S&C)....