UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/SP/SIG/02024

Requirements for Tass Infrastructure - Installation, Test & Maintenance

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 December 2005
Status: active
Page Count: 37
scope:

This document provides installation, test and maintenance details for the TASS system as developed by ALSTOM for use on Network Rail infrastructure in order to ensure that the functionality and ongoing requirements are understood.

Consideration is given to the following installations:-

  • New or Revised Installation (Signal Works Testing Procedure). 
  • Missing, Broken or Faulty Installation (Signal Maintenance Testing Procedure). 
  • Like for Like Replacement. (Signal Maintenance Testing Procedure).

Purpose

This specification defines the installation, test and maintenance requirements for the trackbased equipment associated with the Tilt Authorisation and Speed Supervision (TASS) system developed to deliver the principal requirements of Railway Group Standards GE/RT8012 'Controlling The Speed Of Tilting Trains Through Curves' and GE/RT8019 'Tilting Trains: Controlling Tilt Systems To Maintain Clearances'. This specification covers the following aspects of the system:-

  • TASS track-based equipment installation processes with descriptions of the balise assembly.
  • TASS balise assembly identification and labelling requirements.
  • The TASS Balise Positioning Form and Balise Testing Form records.
  • TASS track-based equipment commissioning.
  • TASS track-based equipment maintenance, faulting and replacement requirements.

Document History

NR/SP/SIG/02024
December 1, 2005
Requirements for Tass Infrastructure - Installation, Test & Maintenance
This document provides installation, test and maintenance details for the TASS system as developed by ALSTOM for use on Network Rail infrastructure in order to ensure that the functionality and...
December 1, 2003
Requirements for Tass Infrastructure - Installation, Test & Maintenance
This document provides installation, test and maintenance details for the TASS system as developed by ALSTOM for use on Network Rail infrastructure in order to ensure that the functionality and...

References

Advertisement