PURPOSE AND SCOPE OF DOCUMENT The purpose of this document is to outline the management issues connected with an IECC scheme. The accent is on passing on experience from all the schemes complete or...
This document references:
NR SAO-IEC-HP-11 - IECC 8001 Sizing & Costing
Published by NR
on
March 25, 2004
PURPOSE AND SCOPE OF DOCUMENT The purpose of this document is to provide all the information that a project engineer will need in the development phase for determining the size of an IECC when it is...
This document references:
NR SAO-ARS-GD-2 - ARS Specification of Timing Rules
Published by NR
on
October 29, 1999
Introduction Automatic Route Setting (ARS) is a system to be used within a railway signalling and control centre to assist the signalman by performing functions such as setting routes for trains and...
This document references:
NR SAO-IEC-HP-13 - IECC 8003 Management Control
Published by NR
on
January 30, 2004
PURPOSE AND SCOPE OF DOCUMENT The purpose of this document is to outline the management issues connected with an IECC scheme. The accent is on passing on experience from all the schemes complete or...
This document references:
NR/L2/SIG/17002 ISSUE 28 - SSI Applications Manual Contents
Published by NR
on
September 3, 2022
The manual covers the design and installation of SSI onto Network Rail’s signalling infrastructure. It lists all approved documents relevant to SSI. Purpose This manual provides for the safe design...
This document is referenced by:
NR SAO-IEC-HP-12 - Project Handbook Preparation of Specification
Published by NR
on
October 29, 1999
PURPOSE AND SCOPE OF DOCUMENT The purpose of this document is to provide all the information that a project engineer will need for preparing a specification which can be used to let either an IECC...