UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

AASHTO - HB-17 DIVISION II SEC 10

Division II Construction - Prestressing

active, Most Current
Organization: AASHTO
Publication Date: 1 January 2002
Status: active
Page Count: 11
scope:

Description: This work shall consist of prestressing precast or cast-in-place concrete by furnishing, placing, and tensioning of prestressing steel in accordance with details shown on the plans, and as specified in these specifications and the special provisions. It includes prestressing by either the pretensioning or post-tensioning methods or by a combination of these methods.

This work shall include the furnishing and installation of any appurtenant items necessary for the particular prestressing system to be used, including but not limited to ducts, anchorage assemblies and grout used for pressure grouting ducts.

For cast-in-place prestressed concrete, the term "member" as used in this section shall be considered to mean the concrete which is to be prestressed.

When members are to be constructed with part of the reinforcement pretensioned and part post-tensioned, the applicable requirement of this Specification shall apply to each method.

Document History

HB-17 DIVISION II SEC 10
January 1, 2002
Division II Construction - Prestressing
Description: This work shall consist of prestressing precast or cast-in-place concrete by furnishing, placing, and tensioning of prestressing steel in accordance with details shown on the plans, and...
January 1, 2002
Division II Construction - Prestressing
A description is not available for this item.
January 1, 1996
Prestressing
A description is not available for this item.
Advertisement