NR/L3/MTC/MG0210 ISSUE 1
Management of Maintenance Work within a Worksite to Prevent a Possession Overrun
| Organization: | NR |
| Publication Date: | 5 December 2009 |
| Status: | inactive |
| Page Count: | 22 |
scope:
This document covers all works being undertaken in a possession or protection except emergency works.
Purpose
This document describes the procedure for managing critical and scare resource, identifying works which import a level of possession overrun risk and how this risk is mitigated or controlled to prevent or reduce their impact.
This procedure addresses the requirement for Infrastructure Maintenance to manage the risk of possession overruns when delivering work within possessions, which are summarised below:
Where a possession contains an Infrastructure Maintenance worksite and at least one Infrastructure Investment worksite, then Infrastructure Investment will 'lead the possession', as described in PM18 GRIP Project Management Manual, Delivering work within possessions and Maintenance will be required to:
a) Analyse and RAG their worksite(s) within a possession, assessing the risk of a possession overrun. Produce contingency plans for sites with 'Amber' and 'Red' ratings to mitigate or reduce the impact on the overrun of a worksite leading to a possession overrun.
b) Input above outputs into Infrastructure Investment 'Readiness Reviews'.
c) Measure and report site work progress for activities on critical path.
d) Implement escalation process if work is not progressing as planned.
The outputs mentioned above including timescales are outlined in this procedure.
The above process shall also apply where outside party contractors are undertaking work for Infrastructure Investments.
Where a possession does not contain an Infrastructure Investment worksite, but does contain an Infrastructure Maintenance worksite(s), then Infrastructure Maintenance will lead the possession and be required to:
a) Notify the RAG status and contingency plans to the NDS Planner.
b) Analyse and RAG all appropriate worksite(s) within the possession.
c) Assess the risk of a possession overrun and manage risk(s).
d) Produce worksite contingency plans for sites with 'Amber' and 'Red' ratings to mitigate or reduce the impact on the overrun of a worksite leading to a possession overrun.
e) Review all RAG ranked worksites at the Infrastructure Maintenance Services Manager's (IMSM) T-6 Planning meeting.
f) Measure and report site work progress for activities on critical path.
g) Implement escalation process if the work is not progressing as planned.
The latter process also applies where outside party contractors are undertaking work
Document History