UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ASTM International - ASTM C341/C341M-24

Standard Practice for Preparation and Conditioning of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete Used for Length Change Measurements

active
Buy Now
Organization: ASTM International
Publication Date: 1 July 2024
Status: active
Page Count: 5
ICS Code (Cement. Gypsum. Lime. Mortar): 91.100.10
significance And Use:

4.1 Measurements of length change permit assessment of the potential for volumetric expansion or contraction of cast, drilled, or sawed specimens of hydraulic-cement mortar, and concrete due to... View More

scope:

1.1 This practice covers the procedures for the preparation and conditioning of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete for length change due to causes other than externally applied forces. It can be readily adapted, if desired, to studies of length change involving alternative schedules or environmental treatments.

1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system are not necessarily exact equivalents; therefore, to ensure conformance with the standard, each system shall be used independently of the other, and values from the two systems shall not be combined. The inch-pound units are shown in brackets.

1.3 The text of this standard refers notes and footnotes that provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of this standard.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.Warning-Fresh hydraulic cementitous mixtures are caustic and may cause chemical burns to skin and tissue upon prolonged exposure.2

1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Document History

ASTM C341/C341M-24
July 1, 2024
Standard Practice for Preparation and Conditioning of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete Used for Length Change Measurements
1.1 This practice covers the procedures for the preparation and conditioning of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete for length change due to causes other than...
December 1, 2018
Standard Practice for Preparation and Conditioning of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete Used for Length Change Measurements
1.1 This practice covers the procedures for the preparation and conditioning of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete for length change due to causes other than...
December 15, 2013
Standard Practice for Preparation and Conditioning of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete Used for Length Change Measurements
1.1 This practice covers the procedures for the preparation and conditioning of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete for length change due to causes other than...
June 1, 2006
Standard Practice for Length Change of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete
1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and...
May 1, 2005
Standard Practice for Length Change of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete
1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and...
December 1, 2003
Standard Practice for Length Change of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete
1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and...
July 10, 2003
Standard Practice for Length Change of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete
1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and...
Advertisement