LUL - S1105
Power Service Contract - Performance Specification
| Organization: | LUL |
| Publication Date: | 1 December 2011 |
| Status: | inactive |
| Page Count: | 153 |
scope:
This document has been created within the suite of corporate engineering documents to give visibility to the Power Service Contract and its technical specifications, which replaced many of the Power Standards existing prior to the Power Service Contract.
This issue of the standard replaces 1-105 A2.
Purpose
The purpose of this standard is to identify the performance requirements of the Power Service Contract (PSC) through the inclusion of the five parts of Schedule 5.1 (Performance Specification) of the PSC as an attachment to this standard.
Document History