scope:
The requirements of Modules D to L inclusive apply to alterations (as defined below) to existing level crossings and for new level crossings subject to any project specific deviations already agreed against GI/RT7012.
NOTE Since there are no changed measures from the previous Group Standard which had a compliance date of 5th February 2005, there is no exemption for projects which have not completed GRIP stage 4 or equivalent.
Unless required as a result of risk assessment undertaken in accordance with NR/L2/OPS/100, action to bring existing level crossings into compliance with the requirements of Modules D to L inclusive is not required.
Purpose
This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.
With the withdrawal of GI/RT7012 and its replacement by GK/RT0192, this document is an interim standard to retain the measures pending a full review.
The document consists of this standard and a series of lettered modules reflecting the previous parts of GI/RT7012. The lettered parts start at D to maintain consistency with the withdrawn Group Standard.