UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/30017

Requirements for Level Crossings

active, Most Current
Buy Now
Organization: NR
Publication Date: 3 September 2011
Status: active
Page Count: 15
scope:

The requirements of Modules D to L inclusive apply to alterations (as defined below) to existing level crossings and for new level crossings subject to any project specific deviations already agreed against GI/RT7012.

NOTE Since there are no changed measures from the previous Group Standard which had a compliance date of 5th February 2005, there is no exemption for projects which have not completed GRIP stage 4 or equivalent.

Unless required as a result of risk assessment undertaken in accordance with NR/L2/OPS/100, action to bring existing level crossings into compliance with the requirements of Modules D to L inclusive is not required.

Purpose

This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.

With the withdrawal of GI/RT7012 and its replacement by GK/RT0192, this document is an interim standard to retain the measures pending a full review.

The document consists of this standard and a series of lettered modules reflecting the previous parts of GI/RT7012. The lettered parts start at D to maintain consistency with the withdrawn Group Standard.

Document History

Requirements for Level Crossings
The requirements of the modules listed below apply to alterations (as defined below) to existing level crossings and for new level crossings. Level crossings are subject to various legal...
NR/L2/SIG/30017
September 3, 2011
Requirements for Level Crossings
The requirements of Modules D to L inclusive apply to alterations (as defined below) to existing level crossings and for new level crossings subject to any project specific deviations already agreed...
September 5, 2009
Requirements for Level Crossings
The requirements of Modules C to M inclusive apply to alterations (as defined below) to existing level crossings and for new level crossings subject to any project specific deviations already agreed...

References

Advertisement