UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - S2526

JTC FS2500 Installation and Maintenance

inactive, Most Current
Organization: LUL
Publication Date: 1 March 2012
Status: inactive
Page Count: 95
scope:

The primary users of this document are those involved in the maintenance of JTC equipment on the Bakerloo Line.

Section 3.8 of this document contains general details on useable track circuit lengths and configurations (including those using two receivers), in open and tunnel sections, and the range of operating frequencies, but the Supplier should be consulted regarding the procurement specification of equipment, according to requirements such as location, and whether it is required for maintenance or new-build purposes.

This document replaces SCS-ST-0058-A2.

PURPOSE

This document contains installation, set up, commissioning, fault-finding and maintenance instructions for the track and room-located equipment of FS2500 'Metro' Jointless Track Circuit equipment supplied by Invensys Rail Systems ('Westinghouse').

Document History

S2526
March 1, 2012
JTC FS2500 Installation and Maintenance
The primary users of this document are those involved in the maintenance of JTC equipment on the Bakerloo Line. Section 3.8 of this document contains general details on useable track circuit lengths...

References

Advertisement