VA 07 01 50.19
PREPARATION FOR RE-ROOFING
| Organization: | VA |
| Publication Date: | 1 October 2010 |
| Status: | active |
| Page Count: | 12 |
scope:
DESCRIPTION
A. //Roof tear-off,// //partial roof tear-off,// //temporary roofing membrane,// //roof re-cover preparation,// //removal of base flashings// on existing construction in preparation to receive new roofing membrane. SPEC WRITER NOTE: Modify paragraph below to adequately describe existing roofing system or systems to be prepared for reroofing.
B. Existing Membrane Roofing System: //Built-up asphalt// //Built-up coaltar// //EPDM// //CSPE// //PVC// //TPO// //Modified bituminous// roofing membrane, with related insulation, surfacing, and components and accessories between deck and roofing membrane. SPEC WRITER NOTE: References in Related Work article below are in addition to cross-references to other sections located in the section text.
Document History