VA 01 32 16.01
ARCHITECTURAL AND ENGINEERING CPM SCHEDULES
| Organization: | VA |
| Publication Date: | 1 January 2011 |
| Status: | active |
| Page Count: | 9 |
scope:
DESCRIPTION:
The Architect/Engineer of Record (A/E) shall develop a Critical Path Method (CPM Schedule) plan and schedule demonstrating fulfillment of the contract requirements as designated in VA PG 18-15, shall keep the CPM up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract. Conventional Critical Path Method (CPM) Precedence Diagramming Method (PDM) technique will be utilized to satisfy both time and cost applications. All schedule data and reports required under this specification section shall be based upon regular total float, not relative total float schedules.