VA 01 32 16.01

ARCHITECTURAL AND ENGINEERING CPM SCHEDULES

active, Most Current
Organization: VA
Publication Date: 1 January 2011
Status: active
Page Count: 9
scope:

DESCRIPTION:

The Architect/Engineer of Record (A/E) shall develop a Critical Path Method (CPM Schedule) plan and schedule demonstrating fulfillment of the contract requirements as designated in VA PG 18-15, shall keep the CPM up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract. Conventional Critical Path Method (CPM) Precedence Diagramming Method (PDM) technique will be utilized to satisfy both time and cost applications. All schedule data and reports required under this specification section shall be based upon regular total float, not relative total float schedules.

Document History

VA 01 32 16.01
January 1, 2011
ARCHITECTURAL AND ENGINEERING CPM SCHEDULES
DESCRIPTION: The Architect/Engineer of Record (A/E) shall develop a Critical Path Method (CPM Schedule) plan and schedule demonstrating fulfillment of the contract requirements as designated in VA...