VA 31 23 19
DEWATERING
active, Most Current
| Organization: | VA |
| Publication Date: | 1 December 2005 |
| Status: | active |
| Page Count: | 5 |
scope:
DESCRIPTION:
This section specifies performance of dewatering required to lower and control ground water table levels and hydrostatic pressures to permit excavation, backfill, and construction to be performed in the dry. Control of surface water shall be considered as part of the work under this specification.
Document History
VA 31 23 19
December 1, 2005
DEWATERING
DESCRIPTION:
This section specifies performance of dewatering required to lower and control ground water table levels and hydrostatic pressures to permit excavation, backfill, and construction to be...