UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

VA 31 32 23

PRESSURE GROUTING SOIL STABILIZATION

active, Most Current
Organization: VA
Publication Date: 1 October 2006
Status: active
Page Count: 3
scope:

DESCRIPTION

This section covers the application of lime slurry into the ground at specified intervals //within 3000 mm (10 feet)// on either side of the new road for the entire length of the new road.//

Document History

VA 31 32 23
October 1, 2006
PRESSURE GROUTING SOIL STABILIZATION
DESCRIPTION This section covers the application of lime slurry into the ground at specified intervals //within 3000 mm (10 feet)// on either side of the new road for the entire length of the new...

References

Advertisement