scope:
Introduction
This document is based on Network Rail Company Guidance Note RT/E/G/00028, plus guidance on its implementation and acceptable variations given to the SSI Signalling Principles Group by Charles Weightman, Network Rail Principles Signal Engineer North. Within SSI8003-85, the following subjects are covered:
- Section 2 Two Reds Rule
- Section 3 Hard Calling of Points beyond the Standard Overlap
- Section 4 Soft Calling of Points beyond the Standard Overlap
- Section 5 Point Flank at Single Ended Points
- Section 6 Overrun Detection
For TPWS related matters, such as TPWS+ and Approach Release Relief, see SSI8003-81.