UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

WRC - BULLETIN 193

BASIC CONSIDERATIONS FOR TUBULAR JOINT DESIGN IN OFFSHORE CONSTRUCTION

active, Most Current
Organization: WRC
Publication Date: 1 April 1974
Status: active
scope:

Background data for Tubular Joint Design Rules in American Codes (API RP 2A and AWS D1.1-72) are reviewed in terms of static ultimate strength and fatigue. The problem of extension to high-cycle fatigue, which becomes increasingly important in severe weather areas and/or deep water, is explored. Case histories of offshore failures and noteworthy non-failures are examined in light of proposed criteria and sensitivity/risk analysis

Document History

BULLETIN 193
April 1, 1974
BASIC CONSIDERATIONS FOR TUBULAR JOINT DESIGN IN OFFSHORE CONSTRUCTION
Background data for Tubular Joint Design Rules in American Codes (API RP 2A and AWS D1.1-72) are reviewed in terms of static ultimate strength and fatigue. The problem of extension to high-cycle...
Advertisement