scope:
A failure in the system-level testing of the MSL Robotic Arm was traced to GSE wiring that was mis-connected. Because re-test was not feasible, the functionality was verified by analysis. For system-level thermal testing during ATLO, the functionality of all GSE instrumentation should be unequivocally verified prior to closing the chamber doors.
Document History
NASA-LLIS-6696
August 28, 2012
Lesson Learned - Verify Test Equipment Functionality Before Testing
A failure in the system-level testing of the MSL Robotic Arm was traced to GSE wiring that was mis-connected. Because re-test was not feasible, the functionality was verified by analysis. For...