UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - OSN091

Route proving for the Hammersmith & City, Circle and Metropolitan lines

active, Most Current
Organization: LUL
Publication Date: 4 November 2010
Status: active
Page Count: 9
scope:

General

Route proving has been used for some time on the Victoria Line to enable a train to pass a signal at danger or proceed after a SPAD incident, without the need to secure points. This minimises delay and reduces risk to staff who would otherwise have to go on the track to secure the points.

The process uses a proceed aspect of a signal reading over points to prove the points of a crossover are set in the correct position for a train on an adjacent line to proceed.

This procedure is now being introduced at approved locations on the Hammersmith & City, Circle and Metropolitan lines. The procedure will work in the same way as on the Victoria Line, except that the train operator will need to stop and reset the tripcock after passing the signal at danger.

Document History

OSN091
November 4, 2010
Route proving for the Hammersmith & City, Circle and Metropolitan lines
General Route proving has been used for some time on the Victoria Line to enable a train to pass a signal at danger or proceed after a SPAD incident, without the need to secure points. This...
July 26, 2009
Route proving for the Hammersmith & City, Circle and Metropolitan lines
General Route proving has been used for some time on the Victoria Line to enable a train to pass a signal at danger or proceed after a SPAD incident, without the need to secure points. This...
Advertisement