UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-6456

Lessons Learned - Atmospheric Revitalization and Pressure Control System (ARPCS)

active, Most Current
Organization: NASA
Publication Date: 28 September 2012
Status: active
Page Count: 2
scope:

This lesson learned provides a summary of ground operations lessons learned for the Space Shuttle Atmospheric Revitalization and Pressure Control System compiled in June 2011. Lessons learned topics covered include: composite overwrap pressure vessel stress rupture failure mode, O2/N2 flow sensor problems, ground support equipment pressure distribution unit calibration, negative pressure relief valve failure to reseat, fire bottle quantity verification, test requirements, latching valves and position indication, and cabin leak checks.

Document History

NASA-LLIS-6456
September 28, 2012
Lessons Learned - Atmospheric Revitalization and Pressure Control System (ARPCS)
This lesson learned provides a summary of ground operations lessons learned for the Space Shuttle Atmospheric Revitalization and Pressure Control System compiled in June 2011. Lessons learned topics...
Advertisement