UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/30014/E110

Signalling Works Testing Glossary

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 June 2012
Status: active
Page Count: 24
scope:

This Level 2 standard applies to all projects to alter Network Rail's signalling infrastructure.

This Signalling Works Testing Glossary is an individually published section of the Signalling Works Testing Handbook NR/L2/SIG/30014.

Purpose

This Level 2 standard supports the Signalling Works Testing Handbook NR/L2/SIG/30014 in providing the glossary used in the instructions and guidance to Signalling Works Testers on the mandatory procedures and process controls so that new signalling installations, and alterations to existing installations, are independently tested in a manner that confirms:

• Compliance with the Project Concept Design and Engineering Details, and fitness for purpose before the signalling system is offered for Entry Into Operational Service.

This glossary also, as far as practicable, specifies consistent terms used in the procedures and process controls specified in the Signalling Works Testing Handbook NR/L2/SIG/30014.

Document History

Signalling Works Testing Glossary
This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064...
NR/L2/SIG/30014/E110
June 2, 2012
Signalling Works Testing Glossary
This Level 2 standard applies to all projects to alter Network Rail's signalling infrastructure. This Signalling Works Testing Glossary is an individually published section of the Signalling Works...
December 5, 2009
Signalling Works Testing Glossary
This Level 2 standard applies to all projects to alter Network Rail's signalling infrastructure. This Signalling Works Testing Glossary is an individually published section of the Signalling Works...

References

Advertisement