UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/001/MOD05 ISSUE 5

Inspection & Maintenance of Permanent Way: Switches & Crossings (S&C)

inactive
Organization: NR
Publication Date: 2 June 2012
Status: inactive
Page Count: 27
scope:

Switches and crossings (S&C) are designed to steer trains safely from one track to another. S&C is more complex than plain line and requires detailed attention in order to manage the risk of derailment and reduce the potential for points failures.

This module of NR/L2/TRK/001 specifies the inspection, minimum actions and maintenance requirements for S&C

Document History

Inspection and Maintenance of Permanent Way: Switches and Crossings
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and Track Maintenance Engineer; b) Inspection requirements and tolerances for 1) wear,  2) flange back contact, ...
December 5, 2020
Inspection and Maintenance of Permanent Way: Switches and Crossings
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and Track Maintenance Engineer; b) Inspection requirements and tolerances for 1) wear, 2) flange back contact, 3)...
June 3, 2017
Inspection and Maintenance of Permanent Way: Switches and Crossings (S&C)
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and TME; b) Inspection requirements and tolerances for 1) wear, 2) flange back contact, 3) free wheel clearance,...
December 1, 2012
Inspection & Maintenance of Permanent Way: Switches and Crossings (S&C)
Switches and crossings (S&C) are designed to steer trains safely from one track to another. S&C is more complex than plain line and requires detailed attention in order to manage the risk of...
NR/L2/TRK/001/MOD05 ISSUE 5
June 2, 2012
Inspection & Maintenance of Permanent Way: Switches & Crossings (S&C)
Switches and crossings (S&C) are designed to steer trains safely from one track to another. S&C is more complex than plain line and requires detailed attention in order to manage the risk of...