NR/SIN/116 ISSUE 2
Special Inspection Notice: Design Deficiency Rectification - Automatic Half Barrier, Miniature Stop Light and Miniature Warning Light Crossings
| Organization: | NR |
| Publication Date: | 5 April 2013 |
| Status: | inactive |
| Page Count: | 9 |
scope:
All sites previously identified by the Route teams as requiring further investigation under NR/SIN/116 (1) are applicable.
Agreement and funding for the completion of NR/SIN/116 (2) shall be managed by the RAM (S).
Purpose
NR/SIN/116 (1) mandated the examination of all AHB, MSL and MWL crossings for a similar design defect to identify and list sites that require further investigation.
The purpose of NR/SIN/116 (2) requires that all sites identified as requiring further investigation, are examined by a person competent in the evaluation of Level Crossing circuits and establish if the failure mode exists under NR/SIN/116 (1).
Independent checking and verification of all crossings identified by the Routes under NR/SIN/116 (1) where further design investigation is required.
This will enable the Route Asset Manager (Signalling) to programme the intended design solution to eliminate the risk at the affected sites.