UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

FAA - FO 6950.27

SHORT CIRCUIT ANALYSIS AND PROTECTIVE DEVICE COORDINATION STUDY

active, Most Current
Organization: FAA
Publication Date: 3 October 1994
Status: active
Page Count: 10
scope:

PURPOSE. This order directs the accomplishment of short circuit analysis and protective device coordination studies for facility power systems. These power engineering studies are necessary to minimize unscheduled facility outages caused by unanticipated operation of protective devices. Failure of improperly applied power protective devices are a safety hazard to installation and maintenance personnel. Application of uncoordinated protective devices also degrades the reliability and availability of facility power systems.

Document History

FO 6950.27
October 3, 1994
SHORT CIRCUIT ANALYSIS AND PROTECTIVE DEVICE COORDINATION STUDY
PURPOSE. This order directs the accomplishment of short circuit analysis and protective device coordination studies for facility power systems. These power engineering studies are necessary to...
October 3, 1994
SHORT CIRCUIT ANALYSIS AND PROTECTIVE DEVICE COORDINATION STUDY
A description is not available for this item.

References

Advertisement