NPFC - MIL-DTL-32421
Cap, Blasting, Non-Electric, 25 and 200 Millisecond Delay, 70 Ft Shock Tube-M15
active, Most Current
Buy Now
| Organization: | NPFC |
| Publication Date: | 26 June 2013 |
| Status: | active |
scope:
This specification describes the requirements and verification methods for the Cap, Blasting: non-electric, 25 and 200 millisecond delay, 70ft shock tube - M15.
Document History
June 26, 2023
Cap, Blasting, Non-Electric, 25 and 200 Millisecond Delay, 70 Ft Shock Tube-M15
A description is not available for this item.
June 7, 2018
Cap, Blasting, Non-Electric, 25 and 200 Millisecond Delay, 70 Ft Shock Tube-M15
A description is not available for this item.
MIL-DTL-32421
June 26, 2013
Cap, Blasting, Non-Electric, 25 and 200 Millisecond Delay, 70 Ft Shock Tube-M15
This specification describes the requirements and verification methods for the Cap, Blasting: non-electric, 25 and 200 millisecond delay, 70ft shock tube - M15.